Monday, May 26, 2008
Twas the night before Studio...
I get to class This morning and find out that Tim cant figure out how to add the animal code and sounds to the activity code I've finished a while back. And it had been decided that the code i have been working on would no longer be used and we would use the 'percent of activity = percent blurred' code we were working early on. This made me a little annoyed since my part of the assignment had been pretty much tossed to one side the day before it was due and the thing i made yesterday useless. So i hoped to continue to finish the code i had started just incase Tim's way didnt work since that code is slightly less reliable hence me doing the code i did, i check online at umart for a 5m firewire cable so it would be long enough for the camera (because there was none to hire out). Saw they were in stock and went to umart to pick up my purchase, after 10mins in line they call my number only to find that they were really out of stock *sigh* so i gave up on making a back up plan for the code and hoped Tim could implement everything in time for class tomorrow.
At this late stage coding is really only a one person job so i went about trying to make myself useful in other ways. I typed up a few paragraphs for the poster that Jo is printing out and helped Jo do testing with the frame. Also i realised that the frame we had built it too large for the door, and window so that anything we did with the mirror and projector would have to be recreated once we take the frame apart and move it into the Lecture room. We didnt have much success filling the frame with the projection but after talking with bonney on the phone came up with some possible solutions which didn't overly work. So we are just gonna have the projection in a majority of the frame with some places being black. The code all works now with the animals and sounds so its just a matter of getting to class tomorrow and hoping that we get the frame, camera, projector and flash all working somewhere in the right direction.
Saturday, May 24, 2008
Last minute scrambles
Frame
On Tuesday I was told to bring $40 for the frame work that still needed to be built which I was still slightly against but as long as it got done I didn’t mind spending the money. I got to class on Tuesday to find that we still didn’t have the materials needed and that Tim, Jo, and I were going back to my train station to pick up my car and buy the materials. This would have been nice to know before class so I could have just driven to class and save us a lot of trouble. After getting back to class around 3pm my cold had got the best of me and I left Jo and Bonnie to construct the frame. Before going home though I went upstairs and procured a mac mini and eyesight (compute and webcam) for us to use over the coming week.
Coding
Tim was having trouble integrating the activity code in with the audio and video of the animals, so we organized to get together today (Saturday) and we got it working up to the point of adding the real images and audio which we are yet to obtain off other group members. In the absence of the necessary material to complete the coding we did user tests by mounting the camera and the approximate height that our mirror will be and pointing it on a downward angle to test if our theory worked.
Unfortunately for us it didn’t, it was reading peoples upper body movement as a person walking away and the blur jumped around randomly. Instead of recoding it another way we found that if we mounted the camera directly above the area we want people to walk through there is significantly less interference and will work for our final project. So tomorrow I am going to Bunnings to try and find some wood or metal material that we can use in a L shape to mount the camera above our user. We are meeting up on Monday to finish off the code and frame and with a lot of luck will have a working prototype for class on Tuesday.
Saturday, May 17, 2008
Code update
Since I've done the code on the physical interactions Tim will be doing the coding on getting the different animals to come up.
Wednesday, May 14, 2008
WORKING CODE!!!!
On wednesday i met with nathan Hoad and through colaborating with him successfully implemented the Lines idea (which we had almost working for 3weeks except for the blur part) we also added volume control. So as it stands the picture frame image is blured with no sound, and as a person walks close and hits a new activity line the blue decreases and the volume increase to reveal the hide image and audio. then as you was away it returns to its previous state.
When i got home though the swf audio no longer worked, but when i ran the swf from inside the fla the audio worked which is a bit concerning. I am heading to class today to try it on the macs, because it was created on XP and my home PC is Vista, So im hoping its just vista being crap and works on xp and macs
Internet is also playing up at home so i will email everyone a copy when i get to class, Tim had been unable to fully work with the code from home because he hasnt got a webcam, so i've borrowed an old one from my house mate and am meeting him today to give it too him. I tried to find drivers for him but was unsuccessful, which is stupid considering its a known brand 'Logitech' and i was able to find, download and install drivers to make my eyetoy work as a webcam in 2mins. That is life anyway i'll keep you posted since we only have 2 weeks to go.
Saturday, May 10, 2008
Update since my last post.
Been awhile since my last post so I thought I’d better play catch up. I installed flash and had a play around with some code but didn’t come up with anything useful. Michael added me on msn later that night and sent me some code that proved our concept by blurring a picture based on how much activity was in frame, but it wasn’t what we were after for our interaction.
I organized at meeting with Nathan Hoad on the 4th may to help me with the code. On the 2nd of May at midday I got a SMS saying we had a group meeting at 1pm. After a few confused SMS’s back and forth it was found that Julia thought Jo had SMS’d me and Tim and vise versa. I was at work at the time and unable to attend but they organized rolls for us for the presentation for the following Tuesday. Earlier in the week I said I was ok with doing the group task of the 100-200word write up by myself and that was the task I was given for the following week with Tim Jo and Julia doing a poster each.
On the Sunday I got together with Nathan and we started to work out how to do the coding. It was our original idea to take a percent of the image being taken up and convert that to a blur amount. I found out that the activity levels only really read movement from the edge of your body and not all of you so my way of thinking was impossible. What we did is set up a series of lines with each line having multiple activity hit points to capture the activity. As a person hit a new line the amount of blur would change. This was good in theory and we got the lines with hit point set up to the point of adding the blur. But it was getting late and we were unable to apply a working blur to our theory, but luckily we had the proof of concept blur
We got together Tuesday morning at about 8am and worked on our presentation which looked good on paper but when it came to presenting came across very boring and am worried that our concept didn’t come through as well as we might have hoped. I organized with Dekker to send him my code so see if he can see why or our blur wasn’t working but as far as he could see the variable we set wasn’t returning a number and was unsure what we actually wanted to do with the code. So I told him to leave it and organized to meet him this Tuesday the 13th to try and explain it better in person and hopefully get our blur working.
Monday, April 28, 2008
Class tues 22nd
We went to class which started painfully late and afterwards i quickly went and got my swipe card needed to help in the workshop. The four of us all helped apply the cloth to the frame which took us a few hrs to staple and add supports so it wouldn't fall apart. I needed 15mins afterwards to meet up with some people and agreed to meet Tim in a lab to start work on some of the coding. When i got to the labs i couldn't find Tim and after a phone call, asking around if people have seen him and aimlessly going from lab to lab several times i gave up. I did find Michael though and got this details and will contact him tonight when he gets home to get that link for the fading code he mentioned a few weeks back.
Jo also bought a copy of flash CS3 so I've headed home to install that and try to grasp the code that has already been done and work on adding to it for the presentation next week.
Thursday Art Gallery
http://bettathaneveryone.wordpress.com/